Status of the construction of the partial dam on the South Fork of the Shenandoah River upstream of the current White House public boat ramp in Page County off Route 211 on Route 646 and construction of the new public boat ramp on the opposite side of the river.
Summer E. coli Testing Project
Summer E. Coli Test Results for Tuesday, August 15, 2023
These are the E. coli results for the water samples that were collected on, Tuesday, August 15, 2023. None of the sites tested exceeded the criteria utilized by FOSR of